Day One

The art directed street

Production is off to a great start.
Today is filming in a residential street which we needed to both lock down and then make look like a bomb zone.

Most of the filming today was from the Viper Camera with the Venom pack, mounted on a steadicam – which in turn was mounted on the back of a 4 wheel motor bike.

The residents were really helpful as we trashed their street, by the end of the day we had an army of kids helping with every shot.

From a production point of view the Venon pack contains about 10 mins of material similar to a normal film camera load. To clear the Venom pack we had a Codex box at Unit – where there was HD monitoring and checking.

Tomorrow is special effect make up and early calls.

Mike